翻訳と辞書
Words near each other
・ Auchy-lez-Orchies
・ Auchy-lès-Hesdin
・ Auchē
・ Aucilla River
・ Aucilla, Florida
・ Aucke van der Werff
・ Auckengill
・ Auckland
・ Auckland & District Pipe Band
・ Auckland (Countess of Ranfurly's Own) and Northland Regiment
・ Auckland (disambiguation)
・ Auckland (New Zealand electorate)
・ Auckland 500
・ Auckland Adventist Hospital
・ Auckland Airport
Auckland Airport Line
・ Auckland Animal Action
・ Auckland Anniversary Day
・ Auckland Anniversary Regatta
・ Auckland Art Gallery
・ Auckland Australian Football League
・ Auckland Baptist Tabernacle
・ Auckland Botanic Gardens
・ Auckland Castle
・ Auckland CBD
・ Auckland Central
・ Auckland Central (New Zealand electorate)
・ Auckland Chamber of Commerce
・ Auckland Choral Society
・ Auckland City


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Auckland Airport Line : ウィキペディア英語版
Auckland Airport Line

The Auckland Airport Line is a proposed railway line in Auckland, New Zealand to serve the Auckland International Airport by connecting to the Auckland Rail Network by an extension of the (now electrified) Onehunga Branch.
The main barrier is the crossing of the Manukau Harbour between Onehunga and Mangere Bridge. Transit New Zealand, NZTA's predecessor, announced that a bridge across the harbour would be designed to accommodate a rail link. In September 2007 ARTA announced that it was willing to pay Transit $2.5 million to "future-proof" the duplication of the Manukau harbour crossing in order "to accommodate a passenger rail connection".
The Mangere Bridge was built to accommodate a rail link, and NZTA has provided for a rail corridor near the motorway as far as Walmsley Road. The proposed line was the most popular with the public of the three Auckland rail proposals of Mayor Len Brown, although the number of trains would be limited without the City Rail Link to the Britomart Transport Centre.
Mayor Brown had promised a rail link to the Airport during his 2010 election campaign as part of a package of measures to double public transport patronage within 15 years.
The official name for the ''airport link'' in the Long-term Plan 2012–2022 is the ''South Western Airport Multi Modal Corridor Project''.〔
*(【引用サイトリンク】title= Long Term Plan )
The Airport rail link planning study commenced in 2010.〔
*(【引用サイトリンク】title= airport rail planning study to go ahead/ )
Escalating costs (estimated at $1.63b) for the preferred route of a heavy rail line to the Airport have prompted some to raise the possibility of the route being served by light rail as an alternative to heavy rail. This option would make use of existing infrastructure where possible to reduce expenses and involve an interchange with existing heavy rail services at Onehunga.
==References==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Auckland Airport Line」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.